







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
ES Windows Home Additions & ADU: The Tampa Owner’s Guide
ES Windows home additions and ADU construction in Tampa typically runs $45,000 to $130,000 for a finished addition, and $90,000 to $220,000 for a permitted accessory dwelling unit. If you’re reading this because work started and stalled, or a previous contractor walked off mid-framing, we can take over the job and bring it to close-out with the ES Windows products already specified or sourced fresh. Most homeowners discover this isn’t a simple “parts” fix the hard way: they call around after a failed inspection, or they’re standing in a half-framed room looking at exposed rough openings that were supposed to have windows in them weeks ago.
Bradford Remodeling Co Tampa is an independent service provider, not affiliated with ES Windows. We work with ES Windows products because they hold up in Florida’s humidity and hurricane-wind environment, but we are not a factory-authorized warranty center.
Which ES Windows Models This Applies To

ES Windows builds several product lines that show up in Tampa additions and ADUs, and the compatibility question matters before anyone orders glass. The ES Windows series you’re most likely dealing with in a residential addition is either the ES77 impact-rated aluminum line or the ES82 thermally broken aluminum line. Both are common in Florida coastal and near-coastal construction. The ES77 is the heavier impact-rated assembly, and it’s what Tampa building departments want to see when the addition falls within the High Velocity Hurricane Zone requirements or when the window sits in a wind-borne debris region. The ES82 is the energy-code play: it has a thermal break in the frame that cuts heat transfer, which matters in Tampa when the summer sun hits a west-facing ADU wall.
Here’s the compatibility gotcha most people miss: the ES77 and ES82 frames are not dimensionally interchangeable at the rough opening. An ES77 with its impact glazing has a deeper frame profile. If a previous contractor roughed in openings sized for a standard ES82, you cannot drop an ES77 into the same hole without re-framing or shimming beyond manufacturer spec. We measure every rough opening before we order anything, and we write the window schedule down line by line so there is no mystery at inspection. If you have a sticker or label on the window frame, the model number and glass make-up are printed on it. If the label is gone, we can often identify the series from the frame profile and the glazing bead design.
On the OEM versus aftermarket question: for the window units themselves, we use ES Windows OEM products, not substitutes. The aftermarket conversation applies to the surrounding materials: flashing tape, sill pans, and fasteners. Those we source from name-brand manufacturers with written specs, because a failed ADU window is usually not the glass, it’s the flashing detail behind the glass.
Styles & brands we work with







Signs Your ES Windows Home Additions & ADU Is Failing
- Water staining on interior drywall below the window. This almost always traces to a failed sill pan or missing back flashing, not the window itself. The water gets behind the frame and travels down inside the wall cavity before it shows on the finished drywall. By the time you see the stain, the substrate has been wet for a while.
- Condensation between the glass panes. The insulated glass unit has lost its seal. In Tampa’s humidity, a failed seal fogs the glass permanently and the unit cannot be dried out and resealed. The IGU gets replaced.
- Condensation or mold on the interior frame, not the glass. That is a thermal break failure or a frame that conducts heat. It happens more on aluminum frames without a proper thermal barrier. In a humid Tampa summer, the frame sweats and the drywall around it stays damp.
- Windows that will not open or close after the addition was framed. This usually means the rough opening was out of square or the frame was racked during installation. The window was forced in and the sash binds. The fix is pulling the window, correcting the opening, and resetting it.
- Visible gaps around the exterior frame after caulk fails. The caulk joint opens up, water gets behind the flange, and the sheathing starts to rot. Most of the time this is a flashing detail that was skipped at rough-in, and it will not fix itself with new caulk on the outside.
Replacement Cost & What’s Included

A full ES Windows home addition in Tampa runs $45,000 to $130,000 depending on square footage, foundation work, roof tie-in, and how many window openings are in the plan. An ADU runs $90,000 to $220,000 because it carries its own plumbing, electrical service, and sometimes a separate foundation. If you already have the addition framed and the issue is just window replacement or reinstallation, the window-specific scope is much smaller, and we price it as a separate line item inside the project, not as a lump-sum mystery number.
Here is what a typical ES Windows addition scope includes, priced as line items:
- ES Windows impact-rated or thermally broken window units, OEM: $800 to $2,500 per opening, depending on size, series, and glass package
- Rough opening correction and re-framing per window: $300 to $900 per opening when the existing opening is out of square
- Flashing, sill pan, and air-sealing detail per window: $150 to $400 per opening
- Full home addition, turnkey with ES Windows specified: $45,000 to $130,000
- Permitted ADU construction, turnkey: $90,000 to $220,000
Every number above is a written price before any work starts. We do not revise the price after the contract is signed unless the scope itself changes and you approve the change in writing first. The 365-Day Done Right Promise applies to the entire finished project: if anything fails inside that first year, we come back and correct it at no charge.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
Here is my honest split, and I say this as someone who has pulled apart a lot of windows in Tampa and seen what happens when a homeowner tries to save a few hundred dollars on a flashing detail. You can safely check a few things: look for visible gaps in the exterior caulk, check for fog between the glass panes, and confirm whether the window opens and closes without binding. That tells you what you are dealing with. What you should not do is pull an impact-rated ES Windows unit out of a rough opening yourself. These are heavy, the glazing is expensive, and if the rough opening was not flashed correctly the first time, reinstalling the same window on the same failure will just fail twice. More important: if the addition is still under inspection, any window work that is not done to code can get the whole project red-tagged. We pull permits, we fix the opening, and we set the window so the water stays outside. If you are not sure what you’re looking at, call (941) 655-9297 and we will tell you straight.
FAQs

ES Windows aluminum frames in Tampa typically last 25 to 35 years with proper flashing and regular cleaning of the tracks and weep holes. The insulated glass units usually fail first, often between 15 and 25 years, because the seal eventually breaks down in Florida heat and humidity. The frame itself will outlast the glass two times over if the rough opening was flashed correctly from day one.
If the issue is condensation between the panes, no; a failed insulated glass unit gets replaced, not resealed. If the issue is a binding sash or a failed hardware component, that can frequently be repaired in place. We will tell you which one you have before we recommend spending anything. Call (941) 655-9297 and one of our people will walk you through it.
Most Tampa home additions run 4 to 8 months from permit to close-out, and an ADU runs 6 to 12 months depending on the foundation and utility work. The window installation itself is fast; the unknowns are in the existing structure, and anyone who tells you a fixed date before they have opened a wall is guessing. We give you a written schedule with the written price, and the schedule has the same discipline as the number.
We keep common hardware, flashing materials, and sill pans on the truck, but we do not stock full ES Windows units on a shelf. Each unit is ordered to the rough opening dimensions and the glass spec, because a generic off-the-shelf window in Tampa is how you end up re-framing an opening at inspection. The order is placed after we measure, and the lead time is built into the written schedule.
Get a Straight Number for Your Tampa Addition
If you have an ES Windows addition or ADU that needs finishing, repair, or a full re-set, we will give you a written price, a clear scope, and a year-long guarantee on the work. Straight number, clear scope, no surprises at close-out. Call (941) 655-9297 to schedule a free estimate. One of our people answers the phone, day or night.
Written by Curtis Lane, Owner, Bradford Remodeling Co Tampa at Bradford Remodeling Co Tampa, serving Tampa and nearby areas.


